top of page
Villa de obra nueva en Marbella con instalación eléctrica de Sostera

Services › Villas and new builds

NEW CONSTRUCTION · MALAGA — ESTEPONA

Electrical installation for villas and new construction

From the architect's plans to the legalized villa: panels, wiring, lighting and home automation pre-installation, integrated into the construction team.

25 years

+3350

24h

3 languages

team's experience on site

villas and single-family homes

for a detailed, itemized offer

Spanish, English and French

Electrical installation for villas and new construction

The entire electrical package, from the plans to the delivery.

01

Electrical panels and protections

General table and sub-tables dimensioned for the villa, ordered, labeled and with their scheme.

One installer for the entire villa, with a manager who knows the project from beginning to end.

02

Conduits and cabling

Coordinated with the structure and the rest of the installations, according to the REBT.

03

Interior lighting

Recessed lighting, LED profiles and lighting scenes defined with the architect or interior designer.

04

05

KNX home automation pre-wiring

06

Legalization and documentation

Villa de obra nueva en Fuengirola con iluminación exterior e instalación eléctrica de Sostera

METHOD

How we carry out the electrical installation of a newly built villa

Each villa follows the same four-phase process, coordinated with the construction company and the project management team. A single Sostera representative oversees the project from the initial bid to the delivery of the electrical certificate.

01

02

03

04

​

We plan each intervention with the construction company and the project management team, according to the construction schedule.

Channeling in structure, wiring, electrical panel, mechanisms and lighting, at the pace of each phase of the villa.

Installation verifications, electrical certificate (CIE) and complete documentation for the owner and the villa manager.

sostera-cocina_edited.jpg

METHOD

Electrical installations for architects and construction companies on the Costa del Sol.

We work as an electrical team within the construction project, with the same requirements as the rest of the team: deadlines, plans and documentation.

  1. Offer for games in 24 hours, comparable and without surprises.

  2. A single party responsible for the offer to the delivery.

  3. Execution faithfully to the plans; any changes are budgeted beforehand.

  4. Spanish, English and French, with the owner and with the team.

Which regulations apply to the electrical installation of a new villa?

The Spanish Low Voltage Electrotechnical Regulation (REBT) and its technical instructions. Under ITC-BT-10, a home of more than 160 m² of usable floor area, or one with air conditioning or automation systems, is classed as high electrification: the planned load cannot be lower than 9,200 W. In practice, almost every villa we build between Málaga and Estepona falls into this class.

Does a villa need a full electrical project or a technical report?

ITC-BT-04 requires a project signed by a qualified engineer for detached homes with a planned load above 50 kW, and for pools and fountains above 5 kW. Below those thresholds, the installation is documented with a technical design report written by the installation company. We check this with the architect from the first drawings.

At what stage of the build should the electrician start?

Earlier than most people think. Embedded conduits and slab penetrations go in during the structure and outer walls; cabling follows the partition walls; switches, sockets and fittings come with the finishes. If the villa has KNX automation or garden lighting, the bus route and outdoor circuits must be decided before the walls are closed.

How much does the electrical installation of a new villa cost?

It depends on floor area, number of circuits, lighting and the level of automation, so we do not give fixed prices without drawings. From the architect's plans we prepare an itemised quote within 24 hours, with consumer units, cabling, lighting, outdoor work, automation and certification listed separately.

What documents do you hand over at the end?

The electrical installation certificate (boletín) registered with the Junta de Andalucía, the single-line diagrams of the consumer units, the technical report or project as applicable, and the insulation, earth and RCD test results. With that file the distribution company connects the permanent supply.

CONTACT

Let's talk about your project.

We respond within 24 hours, in Spanish, English, or French. You can write to us, call us, or send us your project plans directly.

We wire new-build villas in Marbella, Fuengirola, Mijas, Benalmádena and Estepona, and elsewhere on the Costa del Sol.

Sostera
29640 Fuengirola


+34 689 281 498 · WhatsApp
contact@sostera.co

Monday to Friday: 08:00-21:00

 

Málaga · Benalmádena · Fuengirola · Mijas · Marbella · Benahavís · Estepona

  • Facebook
  • LinkedIn
  • Instagram
Project type
Villa or new build
Full renovation
KNX home automation
Outdoor
Smart locks
Other

Data controller: Sostera SL. Purpose: To respond to your quote request. Rights: Access, rectification, erasure, and others, by writing to contact@sostera.co. More information in our Privacy Policy.

  • WhatsApp
bottom of page