The boletín eléctrico, or Electrical Installation Certificate (CIE), is the document that certifies that a home's electrical installation complies with the Spanish Low Voltage Electrical Regulations (REBT). Sostera, an electrical installation company authorised by the Junta de Andalucía (RII 01-B-D00-29038379), inspects the installation, upgrades it if necessary and processes the certificate for villas and homes from Málaga to Estepona. Indicative prices: electrical certificate from €199 when the installation is already compliant and needs no adjustment (includes the compliance visit and issuing the certificate); full inspection and testing of the installation from €350. Any upgrade work is quoted separately before we start.
What is the boletín eléctrico?
The electrical certificate is the common name for the Electrical Installation Certificate (CIE). It is drafted and signed by an authorized installer, who is responsible for the installation, and is registered with the competent energy authority of the autonomous community; in Andalusia, this is the Junta. Once registered, it receives a file number.
The certificate includes essential information about the installation: the installed power, the maximum permissible power (which limits the contracted power), and the installation diagram. The distribution company requires it to provide electricity supply.
When do you need an electrical certificate?
These are the most common cases in which a new or updated electrical certificate is needed:
-
New supply connection, for example in a newly built villa.
-
Increase in contracted power above the maximum admissible power of the current certificate.
-
Single-phase to three-phase installation conversion.
-
Renovation or expansion of the facility, such as a complete renovation, a swimming pool or a charging point.
-
Contract changes in installations over 20 years old, where the distributor may require a review.
If you are going to buy a second-hand home, it is advisable to ask the seller for the current electrical certificate: it avoids surprises when changing the electricity contract to your name. Before signing, read our electrical checklist for buying a villa.
How do we process your electrical certificate?
The process is simple and we take care of everything:
1. Installation review.
We checked the electrical panel, the protections, the grounding and the general condition of the wiring.
2. Adaptation if necessary.
If something does not comply with the regulations, we will send you a detailed offer within 24 hours to correct it, for example a change of electrical panel or a new grounding connection.
3. Issuance and registration.
We drafted the certificate and registered it with the Junta de Andalucía.
4. Delivery.
We are providing you with the registered certificate so that you can contract or modify the supply with your company.
What does the certificate include?
Owner and property details
Installed power and maximum permissible power
Single-line diagram of the installation
Details and signature of the authorized installation company
Registration file number
Electrical certificate for villas and comprehensive renovations
In a newly built villa or a complete renovation, the electrical certificate is an integral part of the work: when we carry out the entire electrical installation, we deliver the property fully compliant with regulations, including the registered certificate and all final documentation. In existing villas, the inspection for the certificate is often an opportunity to update the electrical panel, protective devices, and grounding system.
We work in Malaga, Torremolinos, Benalmádena, Fuengirola, Mijas, Marbella, Benahavís and Estepona, in Spanish, English and French.